A plan edit landing between a successful Push and the Generate that
followed it made the Supply run from the newer plan while the push answer
reported supply_run generated, so the list could hold a dinner Calendar
never showed (MQ-133-01).

Push now returns the revision it pushed, and the push hook calls
shopping.GeneratePushed, which checks inside its transaction that the
week's plan is still at that revision (week_plans.revision, as the draft
path does) and otherwise fails with ErrPlanChanged, leaving the Supply run
as it was. The push answer then reports supply_run failed with error
plan_changed (retryable: push again), logged as a warning.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 04:59:16 -04:00
orchestrator-agent 7003ff92ec Feature 16: Google Calendar Sync (#130)
CI / ci (push) Successful in 4m51s
Co-authored-by: orchestrator-agent <20+orchestrator-agent@code.cubecraftcreations.com>
2026-10-08 03:13:21 -04:00
orchestrator-agent 1862f450db Feature 14: Weekly Plan Builder (#121)
CI / ci (push) Successful in 3m51s
Co-authored-by: orchestrator-agent <20+orchestrator-agent@code.cubecraftcreations.com>
2026-10-07 16:53:23 -04:00